Do you need planning permission for a summer house or shed?

Short answerUsually not. Summer houses and sheds follow the same permitted development rules as any garden building: 2.5m tall within 2m of a boundary, single storey, behind the front of the house, and used for something incidental like storage or relaxing.

The same rules as any outbuilding

Planning law doesn't distinguish between a shed, a summer house, a log cabin or a garden room. They're all outbuildings, and all follow the permitted development rules.

  • 2.5m maximum height if any part is within 2m of a boundary.
  • Further from the boundary: 4m with an apex or hipped roof, 3m with a mono-pitch roof, or 2.5m with a flat roof.
  • Eaves no higher than 2.5m.
  • Single storey, and not in front of the original front wall of the house.
  • No veranda or balcony at any height, and no decking over 30cm. Many summer houses come with a veranda, so watch for this.
  • All outbuildings and extensions together can't cover more than half the land around the original house.

Maximum shed size without planning

There's no fixed floor-area limit for a shed. The practical limits are height (usually 2.5m, because sheds go near fences) and the 50% garden coverage rule. Most standard sheds and summer houses are well under 2.5m, but some log cabins with tall apex roofs aren't, so check the overall height before you buy.

Summer house verandas

Verandas aren't permitted development at any height. That includes a covered porch area at ground level running along the front, which is how many summer houses and log cabins are sold. Open, uncovered decking is fine as long as it's no more than 30cm high. On a sloping garden this can catch people out, because the low side of the decking can easily end up over 30cm above the ground.

Check your garden room in a couple of minutes

Enter your design and we'll check it against these rules for free. For £19 we'll also check your address for protected areas, Article 4 directions and old planning conditions.

When you need permission

You'll need planning permission for a flat or maisonette, in the grounds of a listed building, or where permitted development rights have been removed. Extra limits apply in conservation areas and protected landscapes. A summer house used as a bedroom or guest annexe also needs permission. All the exceptions.

Last updated 27 October 2026. This guide covers permitted development for houses in England under Schedule 2, Part 1, Class E of the General Permitted Development Order 2015. Wales, Scotland and Northern Ireland have different rules.